1. ϵͳ¸ÅÊö
1 General Description Of The System
ÆûÂÖ»ú°²È«¼à²âÒDZíϵͳ£¨Turbine Supervisory Instrument£¬¼ò³ÆTSI£©ÊÇÒ»ÖÖ¿É¿¿µÄÁ¬Ðø¼ì²âÆûÂÖ·¢µç»úת×ÓºÍÆû¸×µÄ»úе¹¤×÷²ÎÊýµÄ¶à·¼à¿ØÏµÍ³£¬¿ÉÒÔÏÔʾ»ú×é״̬£¬Îª¼Ç¼ÒǺͼÆËã»úϵͳÌṩÊä³öÐźţ¬²¢ÔÚ³¬³öÔ¤ÖõÄÔËÐм«ÏÞʱ·¢³ö±¨¾¯£¬´ËÍ⣬»¹ÄÜʹÆûÂÖ»ú×Ô¶¯Í£»úºÍÌṩÓÃÓÚÕï¶ÏÐÔ¹ÀËãµÄ¸÷ÖÖ²âÁ¿Êý¾Ý¡£
Turbine Supervisory Instrumentation ( Turbine Supervisory Instrumentation , referred to as the TSI ) system is a reliable continuous detection of mechanical operating parameters of the turbine generator rotor and cylinder multi-channel monitoring system that can display unit provides analog output signals for the recorder and computer systems. TSI also output digital signals for alarm and trip when the input signals exceed the limit.
±¾»ú×éTSI²ÉÓõÄÊÇBENTLEY3500ϵÁÐÄ£¼þ¡£ This site use the 3500 series modules form BENTLEY.
¸Ã±£»¤ÏµÍ³Éè¼ÆÓÐÈßÓàµÄµçÔ´Ä£¼þ£¬ÓÉ˫·µçÔ´¹©µç£¬ÈÎһ·µçԴɥʧ¿É·¢³ö±¨¾¯£¬±£Ö¤ÏµÍ³°²È«¿É¿¿¡£
The protection system is provided with a redundant power supply module and is powered by double passage power supply. Alarm can be issued when any one power supply is lost to ensure safety and reliability of the system.
TSIµÄ²âÁ¿»ØÂ·ÊÇÓÉ̽ͷ¡¢Ç°Ö÷ŴóÆ÷¡¢²å¼þʽ×é×°ÒDZíµÈ×é³É¡£Ì½Í·ºÍǰÖÃÆ÷ÔÚ³ö³§Ç°ÒѳÉÌ×½øÐÐÁËÏßÐÔУ׼£¬°²×°Ê±Òª³ÉÌ×°²×°¡£
Measurement loop of TSI consists of probe, front-mounted amplifier and socket type assembly instruments. Linear calibration is carried out on probe and front-mounted amplifier before leaving the factory and they should be installed in set.
2. ±àÖÆÄ¿µÄ
2 Preparation of purpose
±àд±¾´ëÊ©µÄÄ¿µÄÊǹ淶TSIϵͳµÄµ÷ÊÔÐÐΪ£¬È·±£É豸¡¢ÈËÉí²»ÊÜÉ˺¦¡£±£Ö¤ÏµÍ³µ÷ÊÔ±£ÖÊ¡¢±£Á¿¡¢ÓÐÐò½øÐС£
The purpose of this procedure is to write a specification TSI system commissioning behavior, ensure that the equipment and person safe. Ensure that the system commissioning quality and orderly manner.
Page 1 of 10
3£®µ÷ÊÔǰµÄÓ¦¾ß±¸µÄÌõ¼þ
3 Necessary Conditions and Preparation before Commissioning
3.1 TSI¿ØÖÆÉ豸°²×°Íê±Ï£¬µçÔ´¾ß±¸Ìõ¼þ£¬¾ÍµØÓëTSI»ú¹ñµÄ½ÓÏßÕýÈ·£¬Ïß¼ä¾øÔµ·ûºÏÒªÇ󣬿¹¸ÉÈÅ´ëÊ©·ûºÏÒªÇó¡£
3.1 Installation of TSI control equipments is finished. The power for TSI is OK. Wiring between field and the TSI cabinet is correct, insulation between lines meet requirements, and anti interference measures comply with requirements.
3.2 Æû»ú±¾Ìå¾ß±¸ÊÔÑéÌõ¼þ£º¸÷Öá³Ð¸Ç¿ªÆô£¬Ì½Í·¹Ì¶¨Ö§¼Ü°²×°Íê±Ï£¬Æû»ú´¦ÓÚÀä̬¡£ 3.2 Main body of the turbine possesses test conditions: all bearing covers are opened, installation of fixing supports of probes is finished and turbine is in cold state. 3.3 ÆûÂÖ»úÍÆÁ¦Å̽ô¿¿¹¤×÷ÍÆÁ¦Íß»ò·Ç¹¤×÷ÍÆÁ¦Íß¡£
3.3 Thrust disc of the turbine is very close to working thrust block or non-working thrust block.
3.4 ±£»¤¡¢±¨¾¯¶¨ÖµÆë±¸¡£
3.4 Set points of protections and alarms are perfect.
4£®µ÷ÊÔ¹¤×÷ÄÚÈݼ°·Ö¹¤
4 Commissioning Items and Procedures
4.1 µ÷ÊÔÏîÄ¿
4.1 Commissioning Items 4.1.1 TSIϵͳ°²×°¼ì²é
4.1.1 Check installation of the TSI system 4.1.2 TSIϵͳË͵缰»Ö¸´
4.1.2 Power initialized and recovery of the TSI system 4.1.3 TSIϵͳ²âÁ¿×°ÖõÄÊÔÑé
4.1.3 Test of measurement devices in the TSI system 4.1.4 ±¨¾¯¡¢ÌøÕ¢¶¨ÖµÐ£ºË
4.1.4 Check set points of alarm and trip 4.1.5 TSIϵͳ±£»¤ÏµÍ³ÊÔÑé
Page 2 of 10
4.1.5 Test of protection systems in the TSI system 4.2 µ÷ÊÔ³ÌÐò
4.2 Commissioning Procedures 4.2.1 TSIϵͳË͵缰³ÌÐò»Ö¸´
4.2.1 Power initialized and program recovery of the TSI system 4.2.2 µçÔ´ÈßÓàÊÔÑé
4.2.2 Power supply redundancy test
±¾ÏµÍ³Éè¼ÆÎªË«Â·µçÔ´ÈßÓ๩µç£¬µ±Ê§È¥Ò»Â·µçԴʱÒÇ±í¹¤×÷״̬²»Ó¦¸Ä±ä¡£ÇÒ·¢³ö±¨¾¯Ðźŵ½ÏàÓ¦µÄ±¨¾¯ÏµÍ³¡£
The system is designed into double passage power redundant power supply. When one power supply is lost, working state of instruments will not be changed and an alarm signal will be sent to corresponding alarm system. 4.2.3 ¼ì²é²âÁ¿ÐźŵÄУÑé¼Ç¼
4.2.3 Check calibration records of measurement signals 4.2.4 ÏÖ³¡°²×°ºÍµ÷ÊÔ
4.2.4 Field installation and commissioning test
1) ÖáÏòÎ»ÒÆºÍÕͲ¸ÐÆ÷µÄ°²×°Õû¶¨
1) Installation and commissioning record of rotor position and differential expansion sensor
ÖáÏòÎ»ÒÆ´«¸ÐÆ÷µÄ°²×°Õû¶¨¼Ç¼±í
Installation and commissioning record of rotor position sensor: ָʾֵ [mm] ÏîÄ¿ ´«¸ÐÆ÷ÀàÐÍ ¼ä϶µçѹ[Vdc] Indicated value Items Sensor type Gap voltage TSI DCS 1ºÅÖáÎ»ÒÆ NO.1 RP 2ºÅÖáÎ»ÒÆ NO.2 RP 3ºÅÖáÎ»ÒÆ NO.3 RP 4ºÅÖáÎ»ÒÆ NO.4 RP ¸ßѹÕͲ¸ÐÆ÷µÄ°²×°Õû¶¨¼Ç¼±í
Installation and commissioning record of differential expansion sensor of HP
Page 3 of 10
330703 330703 330703 330703