Ŀ¼
×ÜÔò 3
General
Ò»¡¢Óйؼ¼ÊõÎļþÓëÏêϸÉè¼ÆÍ¼Ö½ 3
Related Technical Documents and Detailed Design Drawings
¶þ¡¢¶æÏµÀÏß 4
Rudder Unit Alignment
Èý¡¢ÖÆ×÷¼Ó¹¤»ù×¼µã£¬¹Ò¶æ±ÛïÛ¿× 5
Base Point Machining and Rudder Appendage Boring
ËÄ¡¢¶æÏµ¶þ´ÎÀÏß 6
Second Alignment of Rudder Unit
Îå¡¢¹Ò¶æ±ÛÖá³ÐÌ׵ļӹ¤Óë°²×° 7
The Machining and Installation of Rudder Appendage Sleevp
Áù¡¢¶æÏµ²¿·ÖµÄ°²×° 8
Installation of Rudder Unit
Æß£® ¶æ±ú°²×° 9
Installation of Rudder Tiller
°Ë£®¸÷²¿¼ä϶¼°Áãλ½»Ñé 11
Inspection of Parts Clearance and ¡°0¡± Position
¾Å£®¶æ»ú°²×° 12
Installation of Steering Gear
×ÜÔò General
1. ±¾´¬¶æÏµ°²×°ÔÔò£º¶æÏµÀÏßÓëÖáϵͬʱ½øÐС£
1. Rudder unit installation rule of this ship: Rudder unit alignment and shafting system alignment carried out at the same time.
2. ¶æÏµµÄÉÏÏ»ùµã·Ö±ðÉèÔÚ14500mmƽ̨ÉϺÍÁÙʱ֧¼ÜFR0´¦¡£ÉÏÏ»ùµãÒªÓÉ´îÔØ²¿ÃÅÏòÖÊÁ¿²¿ÃÅÌá½»ÈϿɡ£
2. Upper base point of rudder unit lays on 14500mm platform while the down base point lays on temporary support on FR0.
3. ÌØ±ð×¢ÒâÔÚ½øÐб¾¹¤ÒÕÊ©¹¤Ê±£¬Ç°ºó±ØÐëÓÃͬһ°Ñ¾í³ß½øÐвâÁ¿¡£
3. Special attention should be paid on that the same tapeline used from beginning to the end of the measurement.
Ò»¡¢Óйؼ¼ÊõÎļþÓëÏêϸÉè¼ÆÍ¼Ö½
Ò»¡¢Related Technical Documents and Detailed Design Drawings
1. ¶æÏµ²¼ÖÃͼVCS563C-F1-2301
1. Rudder unit Arrangement VCS563C-F1-2301
2. ¶æ³Ð¸½ÌåͼVCS563C-H2-1312
2. Rudder Appendage VCS563C-H2-1312
3. ¶æÒ¶·Ö¶Î½á¹¹Í¼VCS563C-H3-0704
3. Structure Drawing of Rudder Blade Section VCS563C-H3-0704
4. AG02·Ö¶Î½á¹¹Í¼VCS563C-H3-0702
4. Block AG02 Structure Drawing VCS563C-H3-0702
5. ôº²¿²àÐÍͼVCS563C-F1-2307
5. Stern Profile VCS563C-F1-2307
6. ¶æ»ú²Õ²¼ÖÃͼVCS563C-F2-2310
6. Steering Gear Room Arrangement VCS563C-F2-2310
7. ¶æ»ú»ù×ùͼVCS563C-H1-1303
7. Steering Gear Seating VCS563C-H1-1303
8. ¶æ»ú°²×°Í¼VCS563C-F2-2118