75200舵系安装

目录

总则 3

General

一、有关技术文件与详细设计图纸 3

Related Technical Documents and Detailed Design Drawings

二、舵系拉线 4

Rudder Unit Alignment

三、制作加工基准点,挂舵臂镗孔 5

Base Point Machining and Rudder Appendage Boring

四、舵系二次拉线 6

Second Alignment of Rudder Unit

五、挂舵臂轴承套的加工与安装 7

The Machining and Installation of Rudder Appendage Sleevp

六、舵系部分的安装 8

Installation of Rudder Unit

七. 舵柄安装 9

Installation of Rudder Tiller

八.各部间隙及零位交验 11

Inspection of Parts Clearance and “0” Position

九.舵机安装 12

Installation of Steering Gear

总则 General

1. 本船舵系安装原则:舵系拉线与轴系同时进行。

1. Rudder unit installation rule of this ship: Rudder unit alignment and shafting system alignment carried out at the same time.

2. 舵系的上下基点分别设在14500mm平台上和临时支架FR0处。上下基点要由搭载部门向质量部门提交认可。

2. Upper base point of rudder unit lays on 14500mm platform while the down base point lays on temporary support on FR0.

3. 特别注意在进行本工艺施工时,前后必须用同一把卷尺进行测量。

3. Special attention should be paid on that the same tapeline used from beginning to the end of the measurement.

一、有关技术文件与详细设计图纸

一、Related Technical Documents and Detailed Design Drawings

1. 舵系布置图VCS563C-F1-2301

1. Rudder unit Arrangement VCS563C-F1-2301

2. 舵承附体图VCS563C-H2-1312

2. Rudder Appendage VCS563C-H2-1312

3. 舵叶分段结构图VCS563C-H3-0704

3. Structure Drawing of Rudder Blade Section VCS563C-H3-0704

4. AG02分段结构图VCS563C-H3-0702

4. Block AG02 Structure Drawing VCS563C-H3-0702

5. 艉部侧型图VCS563C-F1-2307

5. Stern Profile VCS563C-F1-2307

6. 舵机舱布置图VCS563C-F2-2310

6. Steering Gear Room Arrangement VCS563C-F2-2310

7. 舵机基座图VCS563C-H1-1303

7. Steering Gear Seating VCS563C-H1-1303

8. 舵机安装图VCS563C-F2-2118

联系客服:779662525#qq.com(#替换为@) 苏ICP备20003344号-4