17号楼框架结构摘要(英文、中文)

本人有土木工程专业各种毕业设计三百多套:框架、剪力

墙、砖混、框剪等结构毕业设计;住宅、宾馆、办公楼、教学楼、住宿楼、商场等建筑;高层或多层的毕业设计!计算书及建筑施工图、结构施工图都是成套的,都是合格的毕业设计,也都是各届优秀毕业生的合格毕业设计!施工组织设计的横道图、总平面布置图可以加QQ索要!

意在帮助大家更快的完成毕业设计,以便去实习挣钱! 有意者请联系我! QQ :316525616

Abstract

Engineering for Beichuan County Housing Authority an Chang Zhen Fangguansuo shantytowns placement housing 17# building project, the project for five step six storey, a total of three units, the total number of 24 households. Frame structure, base construction area: 530 square meters, total construction area: 2305.72 square meters. Height difference between indoor and outdoor building 0.15m, building height of 19.90m, the main part of 6 layer, flat roof. Fire resistance rating is two, the roof waterproof grade is grade III, the main structure of the reasonable service life of 50

years.In Beichuan County Anchang Town, the total plane location map of the specific location, seismic fortification intensity is 7 degrees, the basic design of the earthquake acceleration is 0.15g, site class Ⅲ the design characteristic period 0.4s, housing security level is secondary. Time limit for 300 days, starting in June 19, 2015, in which the main structure of the construction period of 43 - 45%.

The project is based on economic management, Southwest University of Science graduate architectural design requirements of the mission statement written in this overview, including engineering design, construction, general layout, arrangethe construction schedule, construction preparation, on-site general layout plan, Surveying, Construction methods and technical measures, quality assurance measures, safe and civilized production and seasonal construction measures ten-part

content.

Keywords:Construction design brick;mix structure;construction scheme;project complexity.

摘要

工程为北川县房管局安昌镇房管所棚户区改造安置房17#楼工程,工程为五跃六层,共三个单元,总户数24户。为框架结构,基地建筑面积:530.00㎡,总建筑面积:2305.72㎡。建筑物室内外高差为0.15m,建筑高度为19.90m,主体部分层数为6层,平屋顶。耐火等级为二级,屋面防水等级为Ⅲ级,主体结构合理使用年限为50年。位于北川县安昌镇,具体位置见总平面定位图,抗震设防烈度为7度,设计基本地震加速度为0.15g,Ⅱ类场地,设计特征周期为0.4S,房屋安全等级为三级。工期为300天,开工时间在2015年6月19日,其中主体结构施工期占总工期的43—45%。

本工程是根据西南科技大学建筑经济管理专业毕业设计任务书的要求编写,本次设计包括工程概况,施工总体布置,施工进度计划安排,施工准备工作,现场总平面布置图,施工测量、定位放线,各分部分项工程施工方法及技术措施,质量保证措施,安全文明生产及季节性施工措施十部分内容。 关键词:施工组织设计砖;混结构;施工方案;项目复杂程度。

联系客服:779662525#qq.com(#替换为@) 苏ICP备20003344号-4