路基高边坡锚杆框格梁施工方案

昆明绕城高速公路东南段B1工区经理部 路基边坡防护锚杆框格梁施工方案

目录 一、编制依据 ·························································································································· 3 二、工程概况 ·························································································································· 3 2.1、锚杆框格梁施工里程部位 ························································································ 3 2.2、工程地质及水文地质情况 ························································································ 3 三、工程重难点分析 ·············································································································· 4 3.1、施工操作平台及支架的搭设 ···················································································· 4 3.2、锚孔注浆······················································································································ 4 四、施工进度计划 ·················································································································· 4 五、施工工艺技术 ·················································································································· 5 5.1、坡面清理及锚杆孔位放样 ························································································ 5 5.2、成孔 ······························································································································ 5 5.3、锚杆制作与安装 ········································································································· 5 5.4、注浆 ······························································································································ 6 5.5、框格梁放样 ················································································································· 6 5.6、框格梁基槽开挖 ········································································································· 6 5.7、钢筋制作与安装 ········································································································· 6 5.8、模板施工······················································································································ 6 5.9、混凝土施工 ················································································································· 7 5.10、混凝土养护 ··············································································································· 7 5.11、拆模 ···························································································································· 7 5.12、填土 ···························································································································· 7 六、资源配置计划 ·················································································································· 7 6.1、劳动力配置 ················································································································· 7 6.2、机械设备配置 ············································································································· 8 七、施工安全保证措施 ········································································································· 8

1

昆明绕城高速公路东南段B1工区经理部 路基边坡防护锚杆框格梁施工方案

八、其他技术保证措施 ········································································································· 9 8.1、质量保证措施 ············································································································· 9 8.2、季节性施工保障措施 ······························································································ 10 8.3、文明施工及环境、职业健康保证措施 ································································ 10 九、附件 ································································································································ 13

2

昆明绕城高速公路东南段B1工区经理部 路基边坡防护锚杆框格梁施工方案

一、编制依据

1.1、昆明绕城高速东南段B1工区施工设计图; 1.2、交通部颁发标准和规范、规程:

(1) 《公路工程质量检验评定标准》(JTG F80/1-2004) (2) 《公路工程安全技术规程》(JTJ076-95) (3) 《公路路基施工技术规范》(JTG F10-2006)

二、工程概况

2.1、锚杆框格梁施工里程部位

2015年3月27日业主及设计方对已完成刷坡的边坡进行现场勘察研究后,确定K70+850~K71+025段路基左侧第三级边坡、K70+205~K70+370段路基右侧第二级边坡采用锚杆框格梁护坡。

2.2、工程地质及水文地质情况

(1) 地形地貌

线路所经区域为滇中高原的一部分,地形较为复杂,其自然环境地表崎岖,群山连绵,山脉呈南北向延伸,与构造线基本一致。

本项目K66+440~K71+470.08段属低中山构造剥蚀、溶蚀地貌单元。 (2) 工程地质条件

路线所经区域出露的地层主要有元古界昆阳群、震旦系、寒武系、志留系、泥盆系、石炭系、二迭系、第三系、第四系地层。

路线所经区域构造体系形迹主要有南北向构造体系、东西向构造体系、新华夏构造体系以及“入”字型构造体系。

在K71+360附近与路线呈约20度交角通过F4断层(南北走向)。 (3) 气候及水文

路线区域属亚热带高原季风气候,具有冬暖夏凉四季如春的特点。

年平均气温14.6℃;多年平均降雨量1040mm,雨季多集中在5~9月,约占全年降水量的70~80%;年蒸发量1500~2100mm;最强3~4月;多年平均绝对湿度13,相对湿度74%。

本项目地下水类型可划分为:松散岩类孔隙水、基岩裂隙水、岩溶水三类,赋存

3