目录
目录 .................................................................. 1 1 综合说明 ........................................................... 3
1.1 自然地理概况 ................................................... 3 1.2 水文与气象 ..................................................... 3 1.3 工程地质 ....................................................... 4 1.4 工程任务与规模 ................................................. 5 1.5 工程布置与主要建筑物 ........................................... 5 1.6 金属结构 ....................................................... 7 1.7 施工组织设计 ................................................... 7 1.8 工程特性 ....................................................... 8 1.9 结论及今后工作意见 ............................................. 9 2水文气象 ........................................................... 10
2.1流域概况 ....................................................... 10 2.2气象 ........................................................... 10 2.3径流与洪水 ..................................................... 10 2.4泥沙 ........................................................... 10 3工程地质 ........................................................... 12
3.1区域地质概况 ................................................... 12 3.2渠首工程地质条件 ............................................... 12 3.3天然建筑材料 ................................................... 12 4工程任务和规模 ..................................................... 13
4.1工程现状及建设的必要性 ......................................... 13 4.2工程任务 ....................................................... 13 4.3工程规模 ....................................................... 13 5工程布置及主要建筑物设计............................................ 14
5.1设计依据 ....................................................... 14 5.2闸枢纽工程轴线选择及总体布置 ................................... 14 5.3主要建筑物的设计 ............................................... 21
1
1
6金属结构 ........................................................... 26
6.1闸门 ........................................................... 26 6.2启闭机 ......................................................... 27 6.3其他部分金属结构 ............................................... 27 7 施工组织设计 ....................................................... 28
7.1施工条件 ....................................................... 28 7.2施工导流及主要建筑物施工 ....................................... 28 7.3施工总进度 ..................................................... 29 7.4工程统计表 ..................................................... 30 谢辞 ................................................................. 33 参考文献: ........................................................... 34 附件一:进水闸水力计算 ............................................... 35 附件二:泄洪冲砂闸及溢流堰的水力计算 ................................. 38 附录三:侧溢流堰的验证计算: ......................................... 43 附录四:渠道的水力计算 ............................................... 45 附录五:消力池和裙板的水力计算: ...................................... 49 附录六:泄洪冲砂闸稳定计算: ......................................... 56 附录七:冲砂闸抗滑稳定计算: ......................................... 61 附录八:上下游水面线计算及导流堤的设计及计算 ......................... 69 附录九:闸室底板配筋计算(用弹性地基梁法) ........................... 76 附件十:侧槽水面线及调整段的水力计算 ................................. 93
2 2
1 综合说明 1.1 自然地理概况
红柳河位于轮台县境内天山南坡,发源于天山南麗霍拉山的索都尔别力山,流域总面积为369㎞2 ,出山口至河源长为36.6㎞,河源最高高程为4146.3m,河源分布有少量永久性冰雪,流域西部分布有成片的森林,约占流域总面积的11.5%,对水源有良好的涵养、调蓄作用。 1.2 水文与气象 1.2.1 流域概况
红柳河位于轮台县境内天山南坡,属山溪性河流,来水主要由北部山区的融雪补给,兼有部分泉水补给。径流形成主要是北部山区的融雪补给。多年平均径流量2.543108 m3,多年平均流量6.34 m3/s。 1.2.2 水文
红柳河属山溪性河流,洪枯水量悬殊,洪水期推移质较多,河床渗漏严重,洪峰大,且来势迅猛。枯水季径流占年径总流量的12%左右,夏季汛期径流量占年径总量的72%左右,最大洪峰大部分出现在7~8月份。红柳河于1985年8月发生了250 m3/s的洪水,1987年7月27日发生321 m3/s的洪水。
年径流量逐月分配表(1982~2000年)见表1-1:
全 年径流量2.54表1-1 年径流量逐月分配表(1982~2000年):单位:水量108m3, 流量:m3/s 月份1月2月3月4月5月6月7月8月9月10月11月12月水量0.00780.00780.01810.04540.15090.63240.94610.42510.16850.07780.03890.0181流量%0.300.310.300.310.700.721.751.79835.825.9524.4036.5016.406.506.643.003.071.501.530.700.7224.9337.2916.763注:多年平均径流量2.54310 m,多年平均流量6.34 m/s。 表1-2 不同频率的洪水流量表: 频率P(%) 流量Qp(m3/s) 0.5 928.8 1 522 2 319.5 3.3 310.5 5 270.0 10 168.3 20 82.8 50 45 75 37.8 1.2.3 气象 最大冻土深91cm;
历年各月极大风速23m/s(发生在4月份);
初霜10月14日,极端早霜9月14日,终霜4月9日,极端晚霜4月14日; 历年各月最高气温41.6℃(1975年7月3日);
历年各月逐旬极端最低气温–25.5℃ (1967年1月25日).
3
3