钻井100句

all ok. Release R/tool

用水下电视协助下永久导向架,座在海底并检查合格后倒出送入工具 81、inspect and repair BOP 检查修理防喷器

82、S.C.R about choke line 100psi with 1.26M.W 30 SPM and No.1 pump

阻流管线的压力降是100psi,泵速为30冲/分,泥浆比重为1.26sg.用的一号泵 83、BOP test as NHWOC’s request ok 按公司指令进行防喷器试压合格 84、pressure test inside BOP gray valve and kelly upper/lower valves ok

方钻杆上下阀, 钻杆内防喷器,浮阀试压合格

85、inspect and repair yellow/blue pod function test BOP ok

检查黄兰盒及防喷器功能试验合格 86、crew working on moon pool and spider deck

井队人员在园井甲板和活动门工作

87、pick up 3 joint risers and R/tool make up install L.M.R.P

拉起三根隔水管及送入工具并连接好插入总承

88、run stack and pressure test choke/kill lines each 3 jts riser

下防喷器及隔水管每下三根试压一次

89、pick up slip joint rig up choke/kill goose necks install rucker ring

下伸缩节组装鹅颈管和支承环

90、jump ROV to watch and check well head well

放潜水器去观察井口状况良好

91、land stack, lock connector check with 30 klbs 0/pull ok

座封和连接井口关连接器上提30千磅检查合格

92、scope out slip jt pick up diverter and install same rig down BOP R/tools

第 6 页 共 7 页

拉出伸缩节内筒座转喷器以及甩下所有送入工具 93、pull out diverter slip joint risers and BOP

起转喷器、伸缩节、隔水管及防喷器

台 风

94、rig evacuate for typhoon 下台撤离防台风

95、first chopper land on rig at 0800hr 八点第一班机到平台 96、crew come back from SAN YA by the NH205 boat at 1700HR

下午五点人员从三亚乘南海205船回到平台

第 7 页 共 7 页