工程管理中英文外文翻译

本科生毕业设计(论文)

外文翻译

题 目 建设项目管理——价值工程 姓 名 学 号 学 院 管理科学与工程学院 专 业 工程管理 指导教师

Construction Project Management——Value Engineering

By:Fredrick E.Gould.Nancy.E.Joyce

ABSTRACT

Value engineering is a kind of in the world proved very fruitful way of project management. In our country, with the improvement of socialist market economy, value engineering, whether in theoretical research or practical application aspects, obtained greater progress, and is gradually applied to engineering project management. Due to the construction of the project design stage investment is less, the owners often ignored this phase of the application of value engineering, but the practice proof, design phase is the possibility of managing investment the biggest stage. Therefore, this paper based on the design stage of a construction project, study the application of value engineering.

Key Words: construction project; value engineering; design stage

Value engineering and cost reduction are often confused, so that the value

engineering in the designer had a bad reputation, however, it is important that value engineering is a process, is to consider the cost of other factors, such as: life cycle cost, quality, durability and maintainability. On the other hand, reduce cost, think only reduced. At the same time they are in rely on a given standard role, we consider in the larger context of the standard, while the other reaction activity is only for budget problem. The project team should be very clear in their processes are involved in. Despite the tight budget reduces life cost, the owners need to know exactly what he or she buys. Value engineering in the process, should the owner to another system reference to buy items or equivalent value system to reduce the cost. In reducing cost in order to save money, he or she is of little value or range less.

Value engineering is all designed products in the active part. Value engineering is

not done enough time, reduce cost becomes necessary. Value engineering provides a\better reduction mode\quantity, save money.

Value engineering is not limited to the construction industry, but in the business world to help analysis is to minimize the cost of the optimal value of object technology and products. The best value is not an intrinsic property of. For each project, it takes on a different meaning, often in other similar product comparison. In the construction which is comparable to many products, it is a complicated job. Therefore, value engineering is as one of the best team in good operation. Value engineering is one of the reasons for negative take designers sometimes feel, architecture is a measure of their work and suggestions, damage the item aesthetic quality. In the process if the designer is an equal partner, this feeling will be reduced. At the same time, the owners need to fully understand the design ideas to make the choice, when the time came, to a specific recommendations for proper balance, to accept or reject.

Owners of professional designers and construction with the help of setting standards. In general, these standards are divided into several categories: best cost, the best optimal function and aesthetic value. Determining the optimal cost for life cycle cost analysis to the building, using the most effective play a role definition. The best aesthetic value, can be difficult to determine, but as with other important criteria. As an important emergency generator case, the team focused on cost and function, but they do not concern for aesthetic values, because the generator will be hidden from view. It takes the first consider the cost, durability, and reliability. Its role will be in accordance with safety requirements and the buildings within the residents needs to decide. In a curtain wall system, the owners pay attention to the cost, function and aesthetic value. Because the system will be the main architectural image, aesthetic value may cost more than the weight, exceeding even function. These are only the owner can decide to make the final.

Including value engineering, all items are redundant. After all, is not a design team to put together the best solution, it finds the optimal solution will satisfy the

联系客服:779662525#qq.com(#替换为@) 苏ICP备20003344号-4