摘要?/p>
本文借鉴国内同容量机组的设计经验,采用定性和定量的分析方法,对神华河?/p>
2
×
350MW
超临界循环流化床燃煤机组给水泵配置方案进行了优化选择,该优化方案满足了电
厂安全、经济、实用以及降低工程造价的需要?/p>
关键词:给水泵、上排汽汽轮机、泵同轴
CFB
The Optimum Selecting Collocation of Feed Water Pump in
SHENHUA HEQU 2
×
350MW CFB Power Plant
Li Chuanyong
(Shandong Eclectic Power Engineering Consulting Institute Corr, LTD, Shandong, Jinan, 250013)
Abstract:
Referencing the design and operation of the domestic same capability units and using
qualitative
and
quantitative
analysis,
this
article
discussed
the
optimum
selecting
collocation
of
feed
water
pump
in
SHENHUA
HEQU
2×
350MW
CFB
power
plant.
The
optimum
result
can
satisfy the need of cogeneration plant in safety, economic, practical and decreasing project cost.
Keyword:
feed water pump
upper exhaust steam turbine
coaxial pump
CFB
0
前言
本文结合国内外超临界技术发展的最新状况及趋势,对神华河曲
2
×
350MW
超临界循
环流化床燃煤机组热经济指标的优化进行探讨?/p>
提出达到国内同类型机组一流热经济指标?/p>
几种可行性技术措施。原
THA
汽机热耗为
8020
kJ/kW.h
,通过一系列综合技术措施,对于
半干法脱硫方案,汽轮机保证工况热耗率减少
87.86 kJ/kW.h
,到
7932.14kJ/kW.h
,发电煤?/p>
优化
302.69g/kW
?/p>
h
,根据电气专业提供的
6.23%
厂用电率,计算供电标煤耗为
322.80 g/kW
?/p>
h
。对于湿法脱硫方案,汽轮机保证工况热耗率减少
126.86
kJ/kW.h
,到
7893.14kJ/kW.h
?/p>
发电煤耗优?/p>
301.2g/kW
?/p>
h
?/p>
根据电气专业提供?/p>
6.45%
厂用电率?/p>
计算供电标煤耗为
321.97
g/kW
?/p>
h
?/p>
1.
工程概况
1.1
项目名称
:神华神东电力河?/p>
2
×
350MW
低热值煤发电新建工程
EPC