Page 1 of 5


LPG STORAGE AND TERMINAL FACILITY
AT HAMBANTOTA
Document No.
HQSM07-00-HSE-JDJSA-005
General Notes:
1.
This JSA must be discussed with all involved personnel prior to job execution. Pre-job planning and daily toolbox meeting should be held on site
prior to starting daily work to discuss relevant issues, technical procedures and assignment during job execution.
2.
Incorporate daily toolbox meeting to consider safety requirements for each task assignment before commencing job.
3.
Ensure that personnel that are handing heavy equipment are certified and the equipment is tested, maintained and cover with necessary
certificates and approved plant access.
4.
Workers shall be required to wear appropriate minimum PPEs e.g. safety goggles, safety helmet, safety shoes, and flame resistant clothing.
5.
In case of emergency, inform the HSE manager Mr. Wang 0094-778505651
SL #
SEQUENCE OF BASIC
JOB STEPS
POTENTIAL HAZARDS
REQUIRED HAZARDS CONTROL
01
?/p>
焊接钢筋?/p>
?/p>
Steel welding
?/p>
高空坠落
fall from height
?/p>
高空坠物
objects fall from height
?/p>
物体打击
object strike
?/p>
进行焊接钢筋带作业者,正确佩戴
好劳保防护用品方可作业?/p>
?/p>
Wear protective appliances before
welding operation
?/p>
每个作业者在作业时候,相互?/p>
解、告知?/p>
Each operator entering into operation
notify
and
get
to
know
each
other
?/p>
s
exsitence .