1. The cumulative CPI has been shown to be relatively stable after what
percentage of project completion?
A. 5% to 10%
B. 15% to 20%
C. 25% to 35%
D. 50% to 75%
1.
在完成项目工作多少个百分比后,累计成本绩效指数相对稳定?
A. 5% to 10%
B. 15% to 20%
C. 25% to 35%
D. 50% to 75%
2. A project is considered complete when
?/p>
-
A. BAC = PV
B. EV = AC
C. PV = AC
D. BAC = EV
2.
?/p>
----
时一个项目可以认为完成了?/p>
A. BAC = PV
B. EV = AC
C. PV = AC
D. BAC = EV
3.
The
project
sponsor
told
the
PM
that
he
wanted
to
cut
the
6
month
project
to
3 months
by
doubling
the
number
of
resources.
The
PM
was
experienced
enough
to
know
this would NOT
work because of
?/p>
A. Sunk costs
B. Resources depreciation
C. Lost opportunity
D. The law of diminishing returns
3.
项目发起人告诉项目经理,
他想通过把资源加倍,
来把工期由六个月减少?/p>
3
个月。经
验丰富的项目经理知道这是不可行的,因为:
A.
沉没成本
B.
资源折旧
C.
损失机会成本
D.
收益递减法则
4. You need to decide between two alternatives. You can either hire a
contractor
to
build
one
of
the
project
?/p>
s
deliverables,
or
you
can
buy
the
deliverable
from an
overseas supplier. Both options require acquisition, operating, and
disposal