龙源期刊?/p>
http://www.qikan.com.cn
风电的环保和安全问题
作者:任孝?/p>
易小?/p>
来源:《风能?/p>
2014
年第
04
?/p>
摘要:针对作为清洁能源的风电正以环保的名义被叫停的现象,分析得出风电发展对环?/p>
利大于弊的结论,并认为要从观念上消除有关安全、生态、视觉等方面的疑虑,继续清洁能源
发展之路?/p>
关键词:风电;安全距离;环保
中图分类号:
TM614
文献标识码:
A
文章编号?/p>
1674-9219
?/p>
2014
?/p>
04-0052-05
Environmental Protection and Safety Problem of Wind Power Industry
Ren Xiaoliang
?/p>
Yi Xiaohui
?/p>
Datang Guiguan Shandong Electric Investment Co.
?/p>
Ltd
?/p>
Yantai 264000
?/p>
China
?/p>
Abstract
?/p>
As clean energy
?/p>
wind power is halted in the name of environment protection. Te
paper tells that wind power development does more good than harm to environment
?/p>
and thinks that
doubts on safety
?/p>
ecology and vision should be eliminated from concept and continue to develop
clean energy.
Keywords
?/p>
wind power
?/p>
safety distance
?/p>
environmental protection
0
引言
随着上世?/p>
90
年代以来风电机组的逐渐大型化和规模化量产,风电作为新型清洁能源?/p>
目已经被全世界越来越多的人认可。自?/p>
2006
?/p>
1
?/p>
1
日开始执行新能源法以来,我国的风
电事业发展飞速,经过短短
6
?/p>
7
年的飞速发展,我国已经成为世界第一风电大国?/p>
然而,风电发展并非一帆风顺,除了电网接入问题、弃风等发展瓶颈,还遇到了诸如减?/p>
让地方政府没有积极性、风电与其他产业新增规划的冲突等问题;更让人难以接受的是,部?/p>
地方政府以影响生态环保问题对风电进行限制,不但在批复项目过程中制造障碍,而且在风?/p>
项目已取得环评批复的情况下,项目批复开工后还以环保的名义被叫停,甚至风电场运营中被
迫搬迁。可以说,目前这种状况已经非常普遍,不但造成风能资源浪费,还给国家造成大量?/p>
人力、物力浪费,这包括前期花费的大量人力、几百万的前期费用;甚至开工建设、运营后?/p>
亿元的损失等。笔者通过学习和实践,对风电与环境保护和安全等问题进行研究,破砖引玉,
希望能杜绝以环保名义要求风电停工等现象的发生,为清洁能源正名?/p>